Skip to main content
File #: 2019-R18    Version: 1 Name:
Type: Resolution Status: Adopted
File created: 3/7/2019 In control: Transportation, Connectivity & Storm Water
On agenda: 3/26/2019 Final action: 3/26/2019
Title: A RESOLUTION AUTHORIZING THE MAYOR TO ENGAGE PRIME AE GROUP, INC. FOR PROFESSIONAL PLANNING AND ENGINEERING SERVICES RELATED TO THE ARLINGTON ROAD CORRIDOR STUDY, AND DECLARING AN EMERGENCY. (Introduced on 3/12/19)
Sponsors: Gerard Neugebauer
Attachments: 1. 2019-R18 Prime AE Group- Arlington Rd. Corridor, 2. 2019-R18 re 619-Myersville Rd RAB #17-H-18, 3. 2019-R18 re Exhibit A PRIME AE (ARLINGTON-CORRIDOR PROPOSAL), 4. Second Reading Passage Request 3-25-19

Title

A RESOLUTION AUTHORIZING THE MAYOR TO ENGAGE PRIME AE GROUP, INC. FOR PROFESSIONAL PLANNING AND ENGINEERING SERVICES RELATED TO THE ARLINGTON ROAD CORRIDOR STUDY, AND DECLARING AN EMERGENCY.  (Introduced on 3/12/19)